
Hama
Hama TV Hi-Fi Headphones Over Ear Stereo Super Long Lead 7m Cable With Volume Control - Black / Grey
EAN 4047443483652 · Model [PK]HAM-483652+CAB192725
Compare price
Boxed2meCheapest
In stock · 3-5 days
£20.52View at Boxed2me
Specifications
- model number
- [PK]HAM-483652+CAB192725
Full specifications
The closed design of the Hama HK-5619 headphones eliminate external disturbances to ensure that you can enjoy music or TV audio in uninterrupted comfort. Compatible with a range of hi-fi systems and televisions in addition to PCs and other devices supporting a 3.5mm audio jack, the HK5619 also comes complete with a 6.35mm adapter for further connection to stereo systems, mixing boards etc.
and an extra long 5m cable extension capable of reaching across the room (e.g. from TV to sofa) giving 7m of available length.Plush ear cushions surround the ears, offering excellent long-wear comfort during extended viewing (i.e. films) and listening sessions, whilst the adjustable padded headband permits a flexible fit to a variety of users and head sizes to prevent rubbing and discomfort.
A gold-plated plug and contacts ensure low contact resistance for optimum signal transmission and high-quality playback.Extra-long cable (7 m (2+5)), specially designed for connecting to TVs or HiFi systemsSingle-sided cable for the ultimate music experience with more freedom of movementThe closed circumaural headphones block out disturbing noise and keep music insidePadded headband for a comfortable listening experience also over long periods of useThe headphones are equipped with an individually adjustable headband which adapts to the shape of your headIncludes a gold-plated adapter for connecting the headphones to a stereo system, mixing board, etc with a 6.35 mm audio outputThe gold-plated coating of the plug ensures secure signal transmission for improved audio qualityColour Black/SilverLine 4TVConnectivity (Connection)Connection 3.5 mm Jack Plug/6.35 mm Jack PlugSize & WeightCable Length 2m+5m - 7mSpeaker Diameter 40 mmElectrospecific PropertiesFrequency Range 20 Hz - 20 kHzImpedance 32 ΩField of ApplicationRecommended Use Hi-Fi or TV/Mobile Music/Mobile PhonePhysical PropertiesDesign Over-EarMaterial Plastic MaterialModel StereoSensitivity 113 dB/ mW